Subsidy Help — PM Surya Ghar (DBT)

We help you apply on the National Solar Rooftop Portal, install with an MNRE‑registered vendor, and receive the Direct Benefit Transfer (DBT) subsidy in your bank account.

At a Glance

  • Residential rooftop solar — MNRE’s Direct Benefit Transfer scheme
  • Apply online on pmsuryaghar.gov.in
  • Choose a registered vendor; install as per standards
  • Upload commissioning & net‑meter documents
  • DBT credited within ~30 days after verification
  • Central Subsidy (CFA): ₹30,000 (1 kW), ₹60,000 (2 kW), ₹78,000 (≥3 kW)
  • State add‑on (Rajasthan): ₹17,000 (≥1.1 kW) for eligible beneficiaries
  • Payback typically 3–5 years; 20–25 years system life
  • Low‑interest loans via Jansamarth

Full Process (Simplified Procedure)

  1. Register at pmsuryaghar.gov.in using active mobile & email; choose State & DISCOM; enter consumer number.
  2. Submit Application with rooftop details, proposed capacity; upload ID, address & bank details.
  3. DISCOM Approval: In‑principle approval & NOC to proceed with installation.
  4. Installation by an MNRE‑registered vendor as per technical standards.
  5. Inspection & Net Metering by DISCOM; obtain net‑meter certificate post checks.
  6. Upload Documents: inspection photos, commissioning report & net‑meter certificate.
  7. DBT Subsidy is credited directly to your bank account, typically within 30 days of verification.

You will need an active mobile number and email ID for registration.

Central Subsidy (CFA) — DBT Amounts

Solar Capacity Central Subsidy (CFA) Typical System Cost* Approx. Net Cost after CFA* Indicative Payback*
1 kW ₹30,000 ₹70,000 ₹40,000 4–5 years
2 kW ₹60,000 ₹1,30,000 ₹70,000 4–5 years
3 kW & above ₹78,000 (max) ₹1,70,000 (for 3 kW) ₹92,000 (for 3 kW) 3–5 years

*Illustrative values for guidance; actual pricing varies by vendor, DISCOM norms & site conditions.

Rajasthan — Additional State Subsidy & Solar Mandate

Extra State Subsidy

  • ₹17,000 additional support for systems ≥ 1.1 kW.
  • Applicable to beneficiaries of the Mukhyamantri Nishulk Bijli Yojana (100 Free Units Scheme).
  • Total potential subsidy = ₹78,000 (Central) + ₹17,000 (State) = ₹95,000.

Solar Installation Mandate

If monthly consumption exceeds 150 units, installing rooftop solar is mandatory to continue availing the 100 free units benefit. Not installing solar may lead to revocation of this benefit.

Eligibility

Documents Required

Identity

Aadhaar or equivalent Govt. ID

Address & Connection

Latest electricity bill; proof of residence/ownership

Bank Details

Account details for DBT transfer; cancelled cheque may be requested

Post‑Installation

Inspection photographs, commissioning report, net‑meter certificate

Vendor/Technical

MNRE‑registered vendor details; system specs per DISCOM norms

Optional (Loans)

Jansamarth loan sanction letter

FAQs

How long does the DBT subsidy take?

Typically within ~30 days after commissioning, verification, and successful document upload.

Can I choose any installer?

Choose from MNRE‑registered vendors listed on the National Portal to remain eligible for subsidy.

What rooftop size do I need?

Approximate guidance: 1 kW ≈ 60 sq. ft; 2 kW ≈ 120 sq. ft; 3 kW ≈ 180 sq. ft (varies by panel efficiency & layout).

Is this only for residential?

Yes — PM Surya Ghar (DBT) is for the residential sector. Commercial/industrial policies differ by state.